First, the installation of cold storage installation requirements:

1. Picking: According to the engineering design and construction materials (Material) to the parts warehouse to receive materials (Material), and carefully check the material (Material) and accessories models.

2. Transportation: Before the cold storage is installed, check the number of cold storage boards according to the invoice. When loading and unloading the library board, it is easy to handle it gently, and the anti-scratch layer is laid on each floor of the board floor and the ground joint.

3. When the cold storage is assembled as a whole, there should be a gap between the wall and the roof. The ground or bottom must be level and the construction environment should be clean.

4. Before the interior of the library body is fixed with angle aluminum, apply the glass seal of Application, and then fix it with the angle aluminum. The rivet spacing is 300 mm. The upper and lower sides of the door are spaced 100 mm apart.

The cold storage installation and disassembly is convenient: the assembly activation time is short, and the cold storage installation library body adopts the buckle connection of the internal embedded parts of the slab wall. Easy to assemble and transport. The equipment cycle is only 1~30~1/20 of the civil cold storage site. It can be delivered within 3~5 days, which is especially suitable for mobile units such as troops, factories and mines and remote areas. The polyurethane foam is a core composite plate with extremely high heat insulation performance, and the polyurethane cold storage plate is made of a color steel plate, a stainless steel, an aluminum plate, a galvanized plate or the like. Production is based on today's world-class Italian equipment. Because the equipment can produce (Produce) long and thick plates up to 12 meters in thickness and up to 300 mm. Coupled with its excellent thermal insulation properties, it is most suitable for buildings with high insulation requirements such as cold storage and clean rooms.

The library body is composed of a bottom plate, a bottom plate, a wall plate and a top plate. The main function is to adjust the level of the floor, and the bottom plate of the reservoir is additionally installed on the floor after the leveling. Ventilation, moisture and rust. The library boards are connected by hooks, and the bottom plate and the wall board of the library body are assembled by different specifications of the floor boards. The board and the board joint are sealed with a sponge tape to prevent leakage. The bottom plate is composed of a convex bottom plate, a middle bottom plate and a concave bottom plate.

It consists of a convex top plate, a middle top plate and a concave top plate. The top plate is similar in composition to the bottom plate. Wall panels are divided into two types: outer wall and inner wall. The outer wall is composed of gussets, double convex wall panels, convex and concave wall panels, and double concave wall panels. Each complete cold storage has four gussets. The gussets are located at the four corners of the library. The rest are convex and concave wall panels. There must be a double convex wall panel on the wall of each door without installing the door. Used for different food storage. The partition wall is used to separate a library into two compartments.

Second, the technical requirements for the installation of the chiller:

1. When selecting the position of the lifting point, first consider the best position of the air circulation. Secondly, consider the direction of the structure of the library,

2. The gap between the air cooler and the library board is greater than the thickness of the air cooler.

3. All hoists of the chiller should be tightened. Sealing bolts and bolts are sealed with a sealant to prevent cold bridges and air leaks.

4. When the ceiling fan is too heavy, apply (Application) No. 4 or No. 5 angle iron to make the beam. The lintel should span across the other roof and wall panels to reduce load bearing.

Adjust the temperature of the warm pack and its superheat. The fan has two types: a low temperature fan (with a defrosting heater) and a high temperature fan (natural defrosting). The ceiling fan assembly includes a fan unit plate, a bolt, a water heating wire, and the like

Third, the assembly requirements of the assembly refrigeration unit:

1. The half-sealed or fully-closed Compression machine should be equipped with an oil separator and add an appropriate amount of oil to the oil. When the evaporation temperature is lower than -15 degrees, a gas-liquid separator should be installed and an appropriate amount of refrigeration oil should be installed. .

2. The base of the compression (Compression) machine should be equipped with a damping rubber seat.

3, the installation of the unit should have a maintenance space, easy to observe the adjustment of the instrument and valve.

4. The high pressure gauge should be installed at the three-way of the liquid storage valve.

5. The overall layout of the unit is reasonable and the colors are consistent. The installation structure of each type of unit should be consistent.

Fourth, refrigeration pipeline installation requirements:

1. The diameter of the copper pipe should be selected in strict accordance with the interface of the compressor (Compression) suction and exhaust valve interface (Interface). The pipe diameter should be increased when the condenser is separated from the Compression machine by more than 3 meters.

2. The suction surface of the condenser and the wall are kept at a distance of more than 400 mm, and the air outlet and the obstacle are kept at a distance of more than 3 meters.

3. The diameter of the inlet and outlet of the liquid storage tank shall be based on the marked exhaust and discharge pipe diameter on the unit sample.

4. Compression machine suction line and air cooler return line should not be smaller than the size of the sample to reduce the internal resistance of the evaporation line.

5. When making the adjustment station, each outlet pipe should be sawed into a 45-degree oblique opening, inserted into the bottom end, and the inlet pipe is inserted into the 1/4 of the adjustment station pipe diameter.

6. The exhaust pipe and the return pipe should have a certain slope. When the condenser position is higher than the Compression machine, the exhaust pipe should be inclined to the condenser and a liquid ring should be installed at the Compression machine exhaust port. Prevent the gas from cooling and returning to the high-pressure exhaust port after shutdown, and causing liquid compression when starting the machine.

7. U-bend should be installed at the exit of the return pipe of the air cooler. The return air line should be in the direction of the Compression machine to ensure smooth oil return.

8. The expansion valve should be installed as close as possible to the air cooler. The solenoid valve should be installed horizontally, the valve body is vertical and the direction of the liquid is noted.

Patch For Diarrhea

Medical Cold Patch
Patch for diarrhea
[Name] Medical Cold Patch
[Package Dimension] 5cm 4pieces/box
The pain relief patch is composed of three layers, namely, backing lining, middle gel and protective film. It is free from pharmacological, immunological or metabolic ingredients.
[Scope of Application] For cold physiotherapy, closed soft tissue only.
[Indications]
The patches give a fast relief for diarrhea.
[How To Use a Patch]
Please follow the Schematic Diagram. One piece, one time.
The curing effect of each piece can last for 6-8 hours.
[Attention]
Do not apply the patch on the problematic skin, such as wounds, eczema, dermatitis,or in the eyes. People allergic to herbs and the pregnant are advised not to use the medication. If swelling or irritation occurs, please stop using and if any of these effects persist or worsen.notify your doctor or pharmacist promptly. Children using the patch must be supervised by adults.
[Storage Conditions]
Store below 30c in a dry place away from heat and direct sunlight.







Patch For Diarrhea,Medicated Patches For Arthiritis,Plaster For Diarrhea,Pad For Diarrhea

Shandong XiJieYiTong International Trade Co.,Ltd. , https://www.xjytmedical.com

Posted on