Operators who should be aware of the use of a two-stage shredder

The operator of the two-stage pulverizer should be trained in the operation principle, operation method and precautions of the two-stage pulverizer before taking up the post. After passing the examination, you can go to work, otherwise you are not allowed to work.

1. Check before starting up. 1.1 Is the equipment inside and outside clear? 1.2 Check whether the connection parts of the equipment are loose. 1.3 Whether the sliding parts are lack of oil. 1.4 Whether the wires are damaged, whether the joints and plugs fall off. 1.5 The vibration parts should be flexible and free of blockage. Turn on the mixer power supply according to the regulations. 3. Crush 3.1 The raw material pulverization requires a particle size of 70 mesh or more. During the pulverization process, some people should be placed next to the pulverizer, and the material should not be cut too fast to prevent clogging.

3.2 Before and after crushing, weigh the weight of the material, make a record, and calculate the yield 4, the work is completed:

4.1 After the material is completely cleaned, turn off the power of the crusher. 4.2 Clean the remaining material in the crusher according to the cleaning procedure. 4.3 Clear the ground, clean the ground in the crushing area, arrange the materials neatly, and return the tools. 5 Note:

5.1 During the operation, it is strictly forbidden to put the hand and iron into the pulverizer. 5.2 When cleaning the machine, it is strictly forbidden to use wet cloth, water, clean power switch 5.3. When the machine is clogged, immediately turn off the power of the pulverizer to prevent burnt electricity. Users can read the procedures we have summarized for you and strictly observe them in production so that you can operate with confidence!